Cool shot showing the intersection of two of Detroit’s main arteries. This is during the Construction of the Ford Freeway (I-94) at Woodward. the snow on the ground means this was probably taken sometime between August and June. Definitely not July – no snow in July.
This entry was posted
on Saturday, May 30th, 2009 at 3:14 am and is filed under Detroit.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.

Leave a reply